
Plastic Washing Machine Mould
Mould design control.
Mould steel certificated.
Mould steel hardness inspection.
Product parameter
Product display
Our certification
Our advantage
Primary Competitive Advantages:
Mould design control.
Mould steel certificated.
Mould steel hardness inspection.
Mould steel electrodes inspection.
Mould core and cavity steel dimension inspeciton.
Mould pre assembly inspection.
Mould trial report and sample inspection.
Mould pre shipment trial inspection.
Export mould package inspection.
Our packaging
Product qualification
FAQ
1.How about your quality control?
We have professional QC team to control mold quality from raw material,machining to the final mould testing parts,as we realize that quality control is the first priority to run business successfully,and the Quality is the life of enterprise.
2.What's your lead time?
For most mold,normally 45 to 60 working days ( not including Chinese official holidays ) after deposit received and mold drawings approved.
3.How to approval samples?
(1)You can come to our factory to see the mold testing directly.
(2)We could send samples by DHL, TNT, Fedex, and we can send mold running video and molding parts dimension inspection report to you by email.
4.What about your after service?
1 year under normal use procedure,Spare part which is non-man made damaged will be offered for free within one year, and you can contact us at any time if you need help.
Send Inquiry